---
title: "Run a structured risk assessment"
description: "Create a scoped assessment, answer it with AI help, review and approve submissions, and decide on the risks AI proposes before they enter the register."
url: https://helpcenter.complytrain.net/en/articles/139-run-a-structured-risk-assessment
collection: "Assessments and AI"
updated: 2026-09-22
language: en
---

# Run a structured risk assessment

Create a scoped assessment, answer it with AI help, review and approve submissions, and decide on the risks AI proposes before they enter the register.

Create a scoped assessment, answer it with AI help, review and approve submissions, and decide on the risks AI proposes before they enter the register.

Use an assessment when a structured questionnaire should produce risks: a data-protection impact assessment, a vendor review, a product or ICT-system assessment. The assessment records who answered what, who approved it and which risks it produced. Reassessing later shows what changed.

## Create the assessment

Product location: `/rms/assessments/new`. Choose a published Template and complete the scope, then Create assessment.

1.  Open **Assessments** under **Risks** and choose **New Assessment**.
    
2.  Optionally narrow the list with **Filter by standard**, then choose a published **Template**.
    
3.  Enter an **Assessment name** and choose the **Scope type** that fits, such as a project, product, vendor, asset or process. Describe exactly what is covered in **Scope label**, for example “Cloud temperature logging service, EU region”.
    
4.  Choose the **Owner** who answers and maintains the assessment. Optionally choose an **Approver** and a **Review frequency (days, optional)** for periodic reassessment.
    
5.  Choose **Create assessment**.
    

If no published template is available, the page offers **Open catalog** to adopt a ready-made template and **Create your own** to author one with AI; see [author an assessment template](https://help.complytrain.net/en/rms/author-assessment-template/).

![No published assessment template is available in this fixture. Use Open catalog or Create your own before starting an assessment.](https://staticfiles.gleap.io/p6950dfbf97796f2087a9f022/MNViqRBYrDWNjfxZxbbJEa1e1XYcXlbDgpPanHhNbn3R7DSrebBKFXKch2nIgtVIid6DsFJjngq.png "Resolve the template prerequisite")

## Fill in a submission

Product location: `/rms/assessments/{instanceId}` (fallback: `/rms/assessments`). Choose New Submission or open the current submission.

Open the assessment and choose **New Submission**. Each submission is one complete answer to the template. The assessment keeps every submission as its history.

Answer the questions and use **Save draft** to keep unfinished work. **Submit for review** sends the answers to review. A submission can no longer be edited once submitted.

The **Risk Assessment Companion** beside the form helps you answer well:

-   **Get help with a specific question** explains the question and its terms. **Help me answer** proposes an answer based on what you have already entered and any previous submission.
    
-   **Use this answer** copies a proposed answer into the form. It is not saved until you save the draft or submit.
    
-   **Check before submit** lists **Things to consider before you submit**, such as gaps or inconsistent answers.
    

The companion reads and suggests; it does not submit anything.

If a submission is already open, starting another shows a warning. Open the existing submission instead, unless you really need a second draft.

## Review and approve the submission

Product location: `/rms/assessments/{instanceId}/submissions/{submissionId}` (fallback: `/rms/assessments`). Use the Review panel: Start review, Approve or Reject.

The reviewer opens the submission and chooses **Start review**, then **Approve**, or **Reject** with a **Rejection reason**. A person cannot approve a submission they submitted themselves, so arrange a separate reviewer. A rejected submission can be returned to its author with **Re-open for editing**.

Approval seals the submission as the assessment's current answer and updates the assessment's classification and next review date. A previously approved submission becomes superseded but remains in the **Timeline**.

## Decide on proposed risks

Product location: `/rms/assessments/{instanceId}/submissions/{submissionId}` (fallback: `/rms/assessments`). Open the approved submission and use AI-proposed risks.

After the first approval, AI reads the answers and proposes risks. **AI-proposed risks** shows how many were proposed, by confidence, and how many await review. If identification is still running, reopen the page shortly.

For each proposal, read the **Rationale**, **Supporting clauses**, **Category**, **Methodology** and suggested inherent and residual scores. Confidence is shown as high, medium or low. Low confidence means the AI is uncertain and the proposal needs particular care.

-   **Accept** creates an Active risk in the register, linked to this submission.
    
-   **Edit before accepting** lets you correct the title, description and methodology, then **Accept with changes**.
    
-   **Reject** asks for a **Rejection reason** and adds nothing to the register.
    

**Bulk-accept high-confidence** accepts every high-confidence proposal at once. Read the list it will affect first: confidence is not approval.

## Reassess and reconcile

Product location: `/rms/assessments/{instanceId}/submissions/{submissionId}` (fallback: `/rms/assessments`). Open the approved re-submission and use Reconciliation.

When circumstances change, or the review date arrives, start a **New Submission**. It is pre-filled from the approved one; change what is different and submit it for review.

When the re-submission is approved, **Reconciliation** compares it with the previous answers and groups the effects:

<table style="min-width: 50px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><th colspan="1" rowspan="1"><p>Group</p></th><th colspan="1" rowspan="1"><p>Accepting it</p></th></tr><tr><td colspan="1" rowspan="1"><p>New risks</p></td><td colspan="1" rowspan="1"><p>Creates a new Active risk, after you review its details.</p></td></tr><tr><td colspan="1" rowspan="1"><p>Still applicable</p></td><td colspan="1" rowspan="1"><p>Records that the existing risk was reaffirmed.</p></td></tr><tr><td colspan="1" rowspan="1"><p>Updated</p></td><td colspan="1" rowspan="1"><p>Applies the proposed changes to the existing risk.</p></td></tr><tr><td colspan="1" rowspan="1"><p>To close</p></td><td colspan="1" rowspan="1"><p>Sets the existing risk obsolete. Enter a <strong>Close reason</strong> in <strong>Close this risk</strong>.</p></td></tr></tbody></table>

Each item shows the **Changed answers** that caused it. **Reject this change** leaves the register untouched. **Confirm all high-confidence** accepts the high-confidence items together. Every accepted change appears in the risk's **History**; see [the risk record](https://help.complytrain.net/en/rms/risk-record/).

## Follow an assessment over time

Product location: `/rms/assessments/{instanceId}` (fallback: `/rms/assessments`). Use the Overview, Timeline and Risks tabs.

The assessment page has three tabs: **Overview** shows the template, owner, classification, next review and current submission. **Timeline** lists every submission with its state and how many risk changes it caused. **Risks** lists the risks this assessment produced.

Use **Retire** when the assessment should take no new submissions; clean up open submissions first. Use **Archive** to make it read-only and hide it from default views. The assessment list filters by status and template.
