# Create an implementation project

Build a timeline from live work or start with an empty project.

Build a timeline from live work or start with an empty project.

## Create the project

Product location: `/planner`. Choose New project or open the intended project.

Open **Planner**, then **New project**. Enter a name and unique short code using lower-case letters, digits and hyphens. Set the **Start date**, which acts as day zero for calculated dates.

Choose **Build it from what we already know** to seed phases, milestones and linked work from live standards, gap analysis and open actions. Select at least one standard for this mode. Only selected standards contribute their scoped work; work with no standard can still be included.

Turn the option off to begin with an empty project. The standards selection records what the project answers for; it does not prevent later additions outside that list.

## Review the initial plan

Product location: `/planner/{planId}/timeline` (fallback: `/planner`)

Open **Overview**, **Timeline**, **Mindmap** or **Board** to inspect the generated structure. Check ownership, dependencies, durations and target milestones before relying on the calculated dates.

The start date affects the whole calculated schedule. Move it deliberately and use **Recalculate schedule** to inspect the consequence.

## Track real work

Product location: `/planner/{planId}/board` (fallback: `/planner`)

Linked work reads progress from its owning module. Investigate broken links and disagreements between a plan's date and the source record's date. Do not assume moving a visual plan item updates every source record.

The progress indicator shows its calculation time and can be stale while recalculating. Use the current project state when preparing a status report.