Plan output documents and the response structure

List the documents the bid must deliver, give each one a response structure of sections, assign owners and due dates, and link every RFP requirement to the section that answers it.

List the documents the bid must deliver, give each one a response structure of sections, assign owners and due dates, and link every RFP requirement to the section that answers it.

An output document is a deliverable the tender asks you to produce, such as a technical proposal, a pricing schedule or a signed declaration. Each output document has a response document, made of sections, that your team writes. Linking each RFP requirement to the section that answers it is what lets ComplyTrain show which requirements your response covers.

Who can do what

Product location: /tender/workspaces/{workspaceId} (fallback: /tender/workspaces). Open the tender in Tenders and choose the Output documents tab.

Task

Who

See output documents, their sections and requirement links

Team members with View Tenders (tender:view); they can open response documents read-only

Add, edit and delete output documents; generate structures; add, edit and delete sections; link and unlink requirements; set a document's owner and due date

Team members with Create & Work on Tenders (tender:manage-workspaces)

Assign an owner and due date to a single section

Team members with Manage Tender Team (tender:manage-team); see section progress

Administrators can do all of these on every tender. Everyone else works only on tenders whose team they belong to. Buttons you cannot use are not shown.

Add output documents

Product location: /tender/workspaces/{workspaceId} (fallback: /tender/workspaces). Open the tender in Tenders and choose the Output documents tab.

Open the tender and choose the Output documents tab.

  1. Enter the deliverable's name in Expected document title….

  2. Choose its category.

  3. Choose Add.

A new output document starts as Not started, required, and included in the submission. Output documents also arrive from RFP analysis and from the Tender Assistant, usually with a description taken from the RFP.

Category

Use it for

Default structure

Proposal

The main written response

Full proposal outline

Technical

Technical approach, method statements

Full proposal outline

Compliance matrix

A requirement-by-requirement compliance table

Compliance sections only

Pricing

Price schedules and commercial offers

Pricing-first outline

CV

Key personnel CVs

Full proposal outline

Certification

Certificates and accreditations you must supply

Full proposal outline

Letter

Cover letters, declarations, letters of intent

Full proposal outline

Other

Anything else (the default)

Full proposal outline

The default structure is what Generate structure creates; see below.

Output document details

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the tender's Output documents tab and select the output document.

Open the output document from the Output documents tab to see and edit its details.

Detail

What it does

Limits and defaults

Title

The deliverable's name, shown everywhere the document appears

Required, up to 500 characters

Category

The kind of deliverable; decides the default structure

Default Other

Status

Not started, Drafting, In review, Final or Submitted

Any status can be chosen; Publish sets Final

Required

Whether the tender demands this deliverable

On by default. A required document included in the submission must be Final or Submitted before the readiness check passes

Submission or Internal

Whether the document goes into the submission package or is an internal working document

Submission by default. Select the pill on the row to switch

Code

The issuer's reference for the deliverable, such as "Annex C"

Optional, up to 100 characters

Description

What the document is for, what it must contain and the RFP's constraints, such as page limits

Optional, up to 20,000 characters. Shown to authors as About this document and given to the AI when it drafts

Owner

The person responsible for producing it

Optional; choose from the people who use Tenders, typing to search

Due date

Your internal target date

Optional. Independent of the tender's submission deadline

Produced document

The finished file in the tender's vault

Set automatically when you publish the response; you can also link an existing vault document

Set the owner and due date in the Owner & deadline panel, then choose Save owner & deadline. The owner and due date appear on the board card.

Track output documents

Product location: /tender/workspaces/{workspaceId} (fallback: /tender/workspaces). Open the tender in Tenders and choose the Output documents tab.

The Output documents tab has two views; switch with Table and Board.

  • Table lists each document with its category and a status list that saves as soon as you change it. Filter the table with All, Submission and Internal.

  • Board shows a column for each status. Drag a card to another column to change its status. Each card shows the category, the Submission or Internal pill, the due date as Due and a date, and the owner or Unassigned. Choose View to open the document.

Open the response document

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the tender's Output documents tab and select the output document.

Select a row in the table, or View on a card, to open the Document Sections page. The response document is created the first time a team member who works on the tender opens it.

The page shows:

  • The document's name, status, code, category, language and dates, and Completeness, the share of sections with content.

  • Back to workspace, Open editor and Add section.

  • An actions panel with Write with AI, Generate structure, Validate, Publish, Promote to library and Delete.

  • The Owner & deadline panel.

  • About this document, when the output document has a description.

  • Two tabs: Sections, with the section progress, coverage and section tree, and AI history.

Writing, review, publishing and the AI history are covered in writing and reviewing sections. Validate is covered in compliance and coverage.

Generate a structure

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the output document from the Output documents tab and choose Generate structure.

Generate structure gives the response document a ready-made outline in one step.

Category

Sections created

All except Pricing and Compliance matrix

Executive Summary; Company & Experience; Technical Approach; Compliance & Requirements; Pricing; Assumptions & Dependencies (optional)

Pricing

Pricing; Assumptions & Dependencies (optional); Compliance & Requirements

Compliance matrix

Compliance & Requirements; Assumptions & Dependencies (optional)

Each section comes with a purpose that tells the author what it should cover. Compliance & Requirements gets one child section for every requirement recorded on the tender, named after the requirement and already linked to it.

A generated section is empty. It does not count towards coverage until it has content, so generating a structure never makes a requirement look answered.

If the document already has sections, Replace existing structure? asks you to confirm. Choose Regenerate to replace them; their content is lost. Choose Cancel to keep them. Add requirements before generating so each one gets its child section; requirements added later need linking by hand.

Add and edit sections

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the output document from the Output documents tab and choose Add section.

Choose Add section in the page header, or Add the first section on an empty document. To add a section inside another, use the add-child action on the parent in the section tree.

Field

What it does

Limits and defaults

Name

The section heading

Required, for example "Executive Summary"

Code

A short reference shown in the outline

Auto-generated if blank

Type

Text, List, Numbered list, Table or Diagram

Default Text. A diagram section opens in the diagram editor

Purpose

What this section should cover; shown to the author and given to the AI

Optional

Optional section

Marks a section the response can leave out

Off by default

Choose Save. To change a section, use its edit action in the tree; the dialog opens with every field filled in. To remove one, use its delete action and confirm Delete section. Deleting a section deletes its content and its requirement links.

To write the content, use the edit-content action on the section, or Open editor.

Link requirements to sections

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the output document from the Output documents tab and use Link requirement under Section progress.

A link records that a section answers a requirement. You can link one requirement to several sections, and one section to several requirements.

  1. On the Sections tab, find the section under Section progress and choose Link requirement.

  2. Link a requirement to the section opens. Type in Search requirements… to narrow the list.

  3. Each candidate shows a short code taken from the start of the requirement's text, its type, and either Not yet addressed or Already in N section(s).

  4. Choose Link.

Linked requirements appear as chips under the section's name. Select the cross on a chip to unlink it. In the section tree, select a requirement chip to open RFP requirement, which shows the full text and Mapped to section; choose Unmap from section to remove the link.

No requirements to link means every requirement is already linked to this section, or the tender has no requirements yet.

How coverage is counted

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the output document from the Output documents tab and read RFP requirement coverage on the Sections tab.

ComplyTrain uses one rule everywhere: a requirement is addressed when at least one section with content is linked to it, or when an existing document is attached to it. An empty section linked to a requirement does not count.

The same rule drives:

  • RFP requirement coverage on this page: the number addressed out of the total, how many of them this document addresses, and a list under Not yet addressed by any section:, or Every RFP requirement is addressed by at least one section.

  • The Covered column and summary on the Compliance matrix tab.

  • Requirement coverage on the Submission tab and the readiness check before you submit.

Attaching an existing document, such as a certificate, is done on the Compliance matrix tab; see compliance and coverage. A link records where the response addresses a requirement. It does not prove you can meet it; record that with the requirement's disposition on the Requirements tab.

Delete an output document

Product location: /tender/workspaces/{workspaceId}/documents/{documentId}/sections (fallback: /tender/workspaces). Open the output document from the Output documents tab and choose Delete.

Choose Delete in the actions panel. Delete this document? warns that this permanently removes the output document and its response. Choose Delete to confirm.

The response document, its sections and their requirement links are removed, and coverage is recalculated. Any requirement that was addressed only by those sections shows as not addressed again. A file already published to the tender's vault stays in the vault.

Example: plan a technical proposal

Product location: /tender/workspaces/{workspaceId} (fallback: /tender/workspaces). Open the tender in Tenders and choose the Output documents tab.

The RFP for a regional hospital's patient-transport contract asks for a technical proposal, a price schedule and a signed form of tender. RFP analysis has added 18 requirements.

  1. On Output documents, the bid manager adds "Form of Tender" as a Letter and keeps "Technical Proposal" (Technical) and "Price Schedule" (Pricing) from the analysis. They add "Bid strategy notes" as Other and switch its pill to Internal, so it never goes into the package.

  2. They open "Technical Proposal", set the code "Schedule 2" and the description "Maximum 30 pages; must follow the evaluation criteria order", choose the operations lead as Owner with a due date a week before submission, and choose Save owner & deadline.

  3. Generate structure creates the six-section outline, with 18 requirement sections under Compliance & Requirements.

  4. Two requirements about vehicle cleaning also belong in Technical Approach, so the bid manager uses Link requirement on that section to link them there too.

  5. RFP requirement coverage shows 0 of 18 addressed, because nothing is written yet. As authors fill the sections, the count rises.